1) Construction surveys
Construction surveys include: Topographic surveys, engineering geological surveys, hydrogeological surveys, surveys of the actual state of works and other surveys to serve construction investment activities (surveys, assessment of the impact of construction work on the surrounding environment) for Level VI to Level I work.
Construction surveys may only be carried out in accordance with approved survey tasks.
2) Construction planning
a) Establish general urban construction planning for urban areas of type 1, type 2, type 3, type 4, type 5, central city districts, new inter-provincial urban areas, new urban areas with a population size equivalent to that of urban areas of type 5 or higher, high-tech areas.
b) Establish detailed urban construction planning for functional areas in urban and industrial zones, high-tech zones, export processing zones, conservation zones, cultural heritage, tourist zones, seaside resorts or other identified areas; renovate and beautify existing urban areas.
c) Establishment of rural residential area planning for central municipal residential areas and concentrated rural residential areas (collectively referred to as “villages”).
3) Formulation of an investment project to construct a work
a) Formulation of construction investment reports (pre-feasibility study reports) and application for investment licenses for major national projects.
b) Formulation of construction investment projects (feasibility study reports) for Group A, B and C projects.
c) Formulation of construction economic-technical reports for the following types of project:
+ Building projects for religious purposes.
+ New construction, renovation, repair and modernization projects with low total investment (according to current state regulations), in line with socio-economic development planning, industry planning and construction planning.
4) Construction design
Construction design (up to level 1) for the following project types: Civil (architecture; structure; M&E, so on); industrial; transportation; information, water supply and drainage, environmental technology, etc.
Depending on the nature and scope of each type of project, construction design can be carried out in one, two or three steps, and other design steps in line with international practice.
5) Verification
a) Verification of the efficiency and feasibility of the construction investment project for Group A, B and C projects.
b) Verification of construction design.
c) Verification of estimates, total construction estimates.
6) Construction investment project management
On behalf of the owner, manage the entire project or individual project elements, supervise quality, construction progress, contract supervision, manage construction investment costs, etc. during the construction investment process.
7) Bid consultancy, contractor selection for construction activities
a) Prepare tender documents based on the following elements:
+ The tender plan approved by the competent authority.
+ The owner’s requirements.
+ Approved design documents and related legal documents.
b) Analyze and evaluate the tender documents (after approval of the tender documents).
8) Construction supervision and equipment installation
Regularly and continuously supervise the construction and installation process of the construction contractor’s equipment on the construction site, in order to guarantee the following factors: progress, quality and safety of work for all types of work: civil and industrial, information networks – postal and telecommunications work, technical infrastructure work, traffic work (bridges, tunnels, roads), supervise engineering geological survey, etc.
9) Assessing the value of assets and equipment
On the basis of current pricing policies, assess the value of the work or of each part of the work, help the owner settle payments during construction, or evaluate investment contributions, joint ventures, etc.
10) Assess and determine the cause of construction incidents
Analyze and assess the cause of construction incidents in order to establish measures to remedy, renovate and improve the structure.
11) Interior and exterior design and construction
Interior design involves organizing the architectural space inside the building, organizing and arranging the objects and small items that create the architectural space in the home (floor, wall, ceiling, etc.). The use of the language of color, light and sound to organize and decorate in order to create aesthetic links, etc.
Exterior design involves organizing the architectural space outside the building. The use of blocks, colors, courtyards, flower gardens, ornamental plants, etc. to create the building’s landscape.
12) Other consulting services
According to client requirements, in compliance with Vietnamese regulations and international practices.